MODULE · 01 // PlanIT — PRODUCTION PLANNING & SCHEDULING

Advanced production planning & scheduling for discrete factories.

PlanIT is an analytics-based, finite-capacity planning engine built on Theory of Constraints, Lean and Agile principles — engineered for tanneries, leather goods, apparel and furniture factories that need to deliver on time, every time.

01 // CORE PRODUCT · TRUSTED ON SHOP FLOORS ACROSS SOUTH ASIA
PlanIT scheduling dashboard on the factory floor
Need of the hour

Planning and scheduling are the yin & yang of any factory.

Planning answers what to make and how. Scheduling answers who makes it and when. Get either one wrong and the order slips.

Done on spreadsheets or with a basic ERP screen, this becomes a slow, error-prone job. The planner spends days rebuilding the sheet every time a new order, a delay or a breakdown shows up. The plan ages the moment it is printed.

InventiX PlanIT replaces that fragile sheet with a real planning engine — one that understands your floor in detail and re-plans in minutes, not days.

Common challenges in production planning

Every factory fights these nine fires every week.

Fire · 01

Change in order quantity

Fire · 02

Delayed supply of raw materials

Fire · 03

Fluctuation in cycle time

Fire · 04

Material rejection

Fire · 05

Resource unavailability

Fire · 06

Machine breakdown

Fire · 07

Change in delivery date

Fire · 08

Sudden rush orders

Fire · 09

Operator absenteeism

PlanIT does not eliminate these disruptions — nothing can. It absorbs them. Within minutes of a change, the schedule is re-balanced across machines, manpower and materials, and every stakeholder sees the new promise date.

Built on proven manufacturing science

Three foundations. One planning engine.

01

Theory of Constraints

Identify the bottleneck, exploit it, subordinate everything else to it. Goldratt's logic, applied to your real shop floor.

02

Finite Capacity Modeling

Plans against actual capacity — calendars, shifts, manpower, machines and molds — never against an infinite wish-list.

03

Lean & Agile Principles

Minimise WIP, expose waste, react fast. Small batches, fast cycles, transparent flow from order to dispatch.

Ideal for discrete manufacturing

One engine, three plant archetypes.

Machinery only

Process plants where the machine is the constraint — drums, presses, CNC, spray lines.

Man & Machinery

Mixed lines where operator skill and machine availability both bind the schedule.

Man, Machinery & Mold

Injection, casting, embossing — where mold changeovers drive sequencing decisions.

The M6 analysis inside PlanIT

Six dimensions. Every plan, every shift.

PlanIT scores every candidate schedule against six real-world dimensions — the M6 — so the plan it gives you is the plan your floor can actually run.

M1

Manpower

Skill, shift, attendance and learning curve — every operator counted against the plan.

M2

Machine & Mold

Machine calendars, mold availability, changeover and breakdown logged as real constraints.

M3

Material

Raw material availability, approval clearance and rejection feedback drive realistic start dates.

M4

Method

Routings, SAM / cycle times and process recipes (drum, cutting, stitching, finishing) built in.

M5

Movement

WIP movement between sections, bottleneck buffers and pack-and-hold tracked end-to-end.

M6

Money

Working capital, WIP value and on-time penalty exposure visible inside every planning decision.

01 · Finite Capacity Planning

Realistic plans grounded in real capacity.

  • Factory calendar, shifts, start/end times — modelled accurately.
  • Accounts for breakdowns, excessive changeovers and operator absence.
  • Justifies overtime, sub-contracting or batch-splitting when they actually help.
  • Strikes a fine balance between demand and available capacity.
Plant supervisor reviewing capacity dashboards
02 · What-If Probability Analysis

Try the change before you make it.

  • Evaluates alternate plans against the same constraints.
  • Compares consequential scenarios — extra shift, rush order, machine down.
  • Schedules multiple work orders concurrently against shared resources.
  • Gives planners the confidence to commit only what the floor can keep.
Planner running what-if scenarios on a tablet
03 · Visual Drag-and-Drop Gantt

Move a bar. The whole plan re-balances.

  • Colour-coded Gantt charts for every machine, line and operator group.
  • Drag to re-sequence — downstream operations recalculate instantly.
  • Share live with sales, sourcing and customers — no more email plans.
  • Drill from order → operation → resource in a single click.
Colourful production Gantt chart with task blocks
Application highlights

Everything a planner needs, in one system.

01

Finite Capacity Planning

Plans only what the floor can actually run — no more wishful Gantt charts.

02

What-If Analysis

Compare 2–3 plans side by side before you commit a single shift.

03

360° Order View

Every work order with priority, material clearance, cycle time and customer date in one system.

04

Drag & Drop Gantt

Re-sequence by hand and the engine re-balances downstream operations instantly.

05

Bottleneck Removal

TOC-based logic highlights the constraint and protects it with the right buffer.

06

Quick Deployment

Live on the floor in a few weeks — on-premise or cloud, standalone or ERP-integrated.

07

Works With Any ERP

SAP, Oracle, Tally, MS Dynamics, custom ERPs, or just clean Excel templates.

08

Built for Discrete

Tannery drums, apparel size-curves, leather goods cells, furniture BOMs — out of the box.

360° order view

Complete visibility before you load the order.

  • User-friendly graphical planning board with every active work order.
  • WO number, specification, quantity, planned start and customer delivery in one row.
  • High / Medium / Low priority auto-flagged from customer and delivery rules.
  • Cycle time and SAM (Standard Allocated Minutes) shown on the same screen.
  • Material availability and approval clearance date visible at the line item.
  • Outsourcing, sub-assembly and inspection slots tracked alongside in-house operations.
Integration

Standalone or extended ERP.

PlanIT runs as a stand-alone planning system or plugs into any ERP — SAP, Oracle, MS Dynamics, Tally, or your custom system. We accept master data via REST APIs, secure file drop or simple Excel templates.

Deployment

On-premise, private cloud or hosted.

A typical deployment is live in a few weeks. Our manufacturing engineers map your floor, configure routings and constraints, train your planners and stay on the line until the first month closes — on-time and on-plan.

Measured business impact

What factories report after going live on PlanIT.

99%
Orders delivered on-time
20%
Reduction in lead time
15%
Throughput increase
−30%
WIP & working capital
−85%
Planner effort vs Excel
<4 wk
Typical deployment

99% of customers see a measurable improvement in production performance within the first quarter — faster than they expected, and with the team they already have.

Next step

Talk to an engineer. Not a sales script.

Every InventiX deployment begins with a no-cost process study by our manufacturing engineers — scoped to your floor, not a generic pitch.